The Sabha Khola bridge is a 120 m span vehicle bridge that provides
essential all-weather access to the Arun 3 hydroelectric project site
and enables disaster relief agencies to cross the river in the event of
earthquakes or other disasters.
We designed, fabricated and shipped the steel for this bridge from our
works in Christchurch, Dorset.
Previously, the crossing of this seasonal river was only fordable by
vehicles and pedestrians for approximately six months of the year. By
taking advantage of the low level of the river during these six months
we were able to build the bridge in situ using trestles.
From the moment they started work on the foundation to bridge
completion it took 12 months. Local contractors were used for the
construction, helping to provide jobs for local people, and were aided
by one of our overseas site advisors.
This new bridge has improved the infrastructure at the hydroelectric
power plant and will allow them to address a capacity shortfall in
electric power generation.
Ref: 117558
REIDsteel Elements | |
---|---|
Structural Design & Detailing | . |
Primary Steel | . |
Fabrication | . |
Packing & Shipping | . |
Installation Supervision | . |
.
.
.
.
Latest News
John Reid & Sons (Strucsteel) Ltd .